80,000 square feet of below grade rigid insulation was installed at the new University of Iowa's Recreation Center.
The new Fort Carson hangar radiant heat system gets a boost from EPS rigid insulation used below grade.
More than 1,000,000 square feet of roof insulation was installed on the new Uline distribution center to ensure long-term efficiency.
250,000 board feet of EPS rigid insulation specified to tackle ponding challenges on Maple Grove Elementary's re-roof.
1,986,000 board feet of EPS rigid insulation was specified to improve energy savings for Badger State Fruit Processing cold storage facility in Wisconsin.